Experience
Track record where downtime is not an option
Selected Case Studies
1. Zero-Trust Grid Migration
Client: National Transmission Operator
Challenge: Ageing MPLS network, rising ransomware activity.
Approach: Designed micro-segmented architecture; orchestrated 680 sub-station cut-overs; delivered blue-green rollbacks.
Outcome: 0 unplanned outages; 45 % latency drop; ISO/IEC 27019 certification in 12 months.
[ Full story LINK]
2. Smart-Meter Cyber Hardening
Client: Regional Energy Retailer (10 M meters)
Approach: Threat-modelled firmware, implemented secure OTA pipeline, ran red-team drills.
Outcome: Reduced exploit surface by 83 %; passed UK Smart Energy Code security audit first time.
3. Rapid Post-Merger Integration
Client: Multi-utility acquiring fibre ISP
Approach: 30-day technology due-diligence, joint OT/IT roadmap, integrated SOC and NOC.
Outcome: £19 M synergy unlocked Y1; unified security posture within 90 days of close.
Impact by Numbers
| KPI | Result |
| Programmes rescued | 27 |
| Average schedule variance after Synechrome | –18 % |
| Mean-time-to-detect (clients, post-engagement) | 14 mins |
| Critical outages during our migrations | 0 |
Client Logos
(SVGs: National Grid, Thames Water, Transport for London, UK Power Networks, etc.)
